A great deal has happened since last week. Take a look!

This is huge. And yes, it is. Here you see the framework for the motorized moveable gallery wall on the second floor. When this wall is in place, the curator can move it back and forth to suit the needs of each particular exhibition.

Big doings on the roof. Stacks of IPE deck flooring planks are ready for installation. When this roof surface is done, it will be unlike anything in town. Or perhaps in this world — or any other!

More ac/heating vents are ready to go downstairs.

The south exterior wall is fully shimmed and leveled for finish out.

Arthouse Board President Julie Thornton displays her acrobatic skills.